This combined cycle cogeneration plant in Debrecen supplies the local provider with 95 MW of electricity and the town of Debrecen with 70 MW of thermal energy (district heating) since its commissioning in 2000. The machine configuration consists of a single shaft block with a 9001FA gas turbine and a 40MW steam turbine with an SSS Clutch.